Location:  Silver Springs High School
 
Description:  Gym Floor Replacement.  Remove existing gym floor , replace with northern maple flooring.  Sand, 2 coats of sealer and 3 coats of finish.  
   
Contractor:  Boberg Hardwood Floors, Inc.
Start Date: November 2019                                 Finish Date:  December 2019
Silver Springs gym old floor being removed.
All of the old floor is out, a layer being added before the new wood flooring goes down.
Workers putting in the new wood floor.
Workers sanding the new wood floor.
The wood floor completely sanded.